Metropolis BR, April 5th, 2016.
|
City Line Subway Would Start At Pecan Valley. |
Metropolis Transit finally concludes a study for a new subway line under City Line Blvd and Greig Street as well as an extension of the 47 Line to Pecan Valley. This study launched in 2013 as part of the 2010-2015 Move Forward Plan. The City Line Blvd Subway would begin from Pecan Valley on a new elevated structure that would run over the existing N trolley line along side an extended 47 Elevated line to Grieg Street where it would run underground in a tunnel under Grieg Street to Greta Way where it will either run in a open trench in the median or as an elevated to a new City Line Park And Ride Station at Woodland Avenue. The current Woodland Subway extension to City Line and Metropolis Int'l Airport is now underway and would meet up with the City Line Subway at such point. They favored the plan are looking at how much the line will cost. If proven successful, it will be eventually extended to the Airport as well on a separate right-of-way.
No comments:
Post a Comment